20ft standardTools, household storage & smaller sites
A smaller footprint; leave extra space to open the doors.
Compare 20ft, 40ft, and high-cube storage containers, also called conex boxes. Check prices, local placement rules, and delivery to your address.
Used container price snapshots. Recorded Nov 6, 2026 from Shipped’s Los Angeles, CA page (nearest published market, 115 mi from Santee). Check the supplier for today’s stock and price.
20ft standardA smaller footprint; leave extra space to open the doors.
40ft standardTwice the external floor area of a 20ft container.
40ft high cubeThe same footprint as a 40ft, with an extra foot of height.
Illustrative container photos, not units offered for sale. *External footprint; interior dimensions are smaller. Color, condition, and availability vary.
Give both suppliers the same size, condition, delivery address, and required date.
| Supplier | What to compare | Price & terms | Next step |
|---|---|---|---|
| SHIPPEDOur supplier notes ↗ | 20ft, 40ft & high cube Used grades and other configurations | Published city prices below. Delivery and taxes are additional. | Check Shipped prices |
| EVEONOur supplier notes ↗ | 20ft, 40ft & high cube Used containers; check one-trip options | Enter your ZIP for a comparable price and transport charge. | Check Eveon prices |
These are Shipped’s advertised unit prices, not delivered quotes or a lowest-price claim.
| Size | Wind & watertight | Cargo worthy | Delivery + tax |
|---|---|---|---|
| 20ft standard | $1,447 | $1,647 | Quoted for your address |
| 40ft standard | $1,747 | $1,897 | Quoted for your address |
| 40ft high cube | $1,827 | $1,977 | Quoted for your address |
Source: Shipped’s Los Angeles, CA price list · Checked Nov 6, 2026. Read Shipped’s grade definitions.
$300 more for twice the footprint. In this Los Angeles, CA snapshot, Shipped’s used 40ft WWT unit costs $300 more than its 20ft. Check the delivery difference and available unloading space before upsizing.
Storage for a project or a season. Compare the whole rental period, including delivery and collection. Availability is address-specific.
20ft standardA smaller footprint; leave extra space to open the doors.
40ft standardTwice the external floor area of a 20ft container.
40ft high cubeThe same footprint as a 40ft, with an extra foot of height.
Illustrative container photos, not units offered for sale. *External footprint; interior dimensions are smaller. Color, condition, and availability vary.
Give both suppliers the same size, condition, delivery address, and required date.
| Supplier | What to compare | Price & terms | Next step |
|---|---|---|---|
| SHIPPEDOur supplier notes ↗ | 20ft & 40ft storage rentals Confirm the exact size and condition | Get the monthly payment, minimum term, delivery and pickup together. | Check Shipped rentals |
| EVEONOur supplier notes ↗ | 20ft, 40ft & high cube Wind & watertight storage rentals | Published 3-month commitment. FAQ and rental terms differ on upfront payment and cancellation notice; confirm the agreement. | Check Eveon rentals |
Compare delivery, condition & supplier terms ↗
Rental terms: Eveon’s rental FAQ and rental agreement terms · Reviewed Nov 8, 2026. Confirm the current agreement before ordering.
Monthly payments toward ownership. Compare the complete agreement against buying. We cover one rent-to-own supplier; this is not a whole-market comparison.
20ft standardA smaller footprint; leave extra space to open the doors.
40ft standardTwice the external floor area of a 20ft container.
Illustrative container photos, not units offered for sale. *External footprint; interior dimensions are smaller. Color, condition, and availability vary.
Compare Shipped’s ownership agreement with an outright purchase using the same size, condition, and delivery address.
| Supplier | What to compare | Price & terms | Next step |
|---|---|---|---|
| SHIPPEDOur supplier notes ↗ | Used 20ft & 40ft plans Confirm title-transfer terms | Get the full payment count, total cost, upfront fees and early-buyout amount. | View Shipped terms |
Yardbox is an independent comparison guide, not a container seller. Supplier links open their websites. How these links work ↗
Build a purchase budget from an advertised container price. Add the charges from your quotes. A blank amount stays unknown; enter $0 only when a cost does not apply.
Starting prices: Shipped’s Santee list ↗, checked Nov 6, 2026. No contact details are collected or sent. Compare all city price snapshots ↗
In Santee, a shipping container is not a backyard shed option: the residential zoning code says sea cargo containers are prohibited. The legal routes are narrower—a temporary use tied to an active building permit, permitted industrial outdoor storage, or an Engineering encroachment permit for anything placed in the street.
Santee's building-code amendments exempt metal shipping containers used as temporary storage from a building permit. That only settles the building-permit question. Zoning still decides whether the container may sit on your lot, and in residential districts the answer in the code is no. [5] [2]
These rules apply only inside Santee city limits. Use the City's Zoning Map to search the parcel and confirm its zone; if the property falls in the Town Center Specific Plan area, turn on that separate zoning layer and use the specific plan's use chapters instead of the base-district tables. For property lines and right-of-way widths, the Planning FAQ refers you to Engineering at 619-258-4100 ext. 167. [9]
Santee's residential standards prohibit sea cargo containers and require stored materials to be inside an enclosed building. The code has no stated day-count allowance for a short-term moving container in a driveway. The Director may approve temporary uses found similar to listed ones, but that is a case-by-case call, not a default. Next step: Do not book a steel container for a Santee home without written direction from Planning. Ask specifically whether a short-term moving unit can be approved as a similar temporary use, and for how long. [2] [1]
§13.06.070(E)(5) lets sea cargo containers sit temporarily on active construction sites to store building materials or merchandise for the life of an active building permit. When the building permit or temporary use permit expires, ends or is finaled, the container and its screening must be removed. This falls under the section's permit-required temporary uses. Next step: Pull the building permit first, then file a Temporary Use Permit through the Santee Portal with a site plan and the planned removal date. [1] [8]
Commercial businesses must operate entirely within an enclosed building except for listed outdoor activities. In the IL and IG industrial districts, accessory outdoor storage needs a minor conditional use permit and must be walled or fully screened, stacked no higher than the enclosure, and limited to materials used or produced on site. Industrial users can also seek a temporary outdoor-storage permit for up to one year, with a recorded covenant, no front-yard placement and view-obscuring fencing up to eight feet. Next step: Confirm the zone, then ask Planning whether your container needs a minor conditional use permit or a one-year temporary outdoor-storage permit. [4] [3] [1]
Any obstruction in Santee's public right-of-way needs an Engineering encroachment permit; curbside dumpsters are named examples. Temporary dumpster-style applications need a site plan, the unit's length, width and height, and how long it will stay. The guide asks for applications at least four weeks ahead, and the city quotes 10–15 working days to process. Next step: Apply on the Permitting & Licensing Portal well before delivery, and ask Engineering whether a full-size container (not just a dumpster) can be permitted at your curb. [6] [7] [1]
Match the rental term to a Santee approval you already hold. On a construction site the container must go when the building permit or temporary use permit ends; industrial temporary outdoor-storage permits run for a maximum of one year. Shipped and Eveon publish three-month minimum commitments, so a short street placement or a brief job may still carry three months of rent. Confirm early-pickup terms in the contract before booking.
Search your address on the City Zoning Map. If it is residential, the container ban applies; if it is in the Town Center Specific Plan area, check that layer and plan instead. [9]
Santee Planning FAQ and Zoning MapContact Planning at 619-258-4100 ext. 167 or planning@cityofsanteeca.gov. Describe the container size, contents, location and dates, and any building permit number. Temporary uses are filed on the TUP application through the Santee Portal. [8] [10] [1]
Santee Temporary Use Permit applicationSubmit an encroachment permit on the portal with a site plan, dimensions and duration at least four weeks before delivery. Then book a delivery and pickup that fall inside the permitted dates. [6] [7] [11]
Santee encroachment permits“I’m considering a container placement in Santee at [address / parcel]. It is [size], for [use], for [duration], in the location on this sketch. Which zoning, building, and street-use approvals apply?”
This guide identifies questions and official resources. The responsible authority must confirm the requirements for your project.Show the gate, tight turns, overhead obstructions, ground surface, and final door direction. Ask for approval of the full route before setting a delivery date.
Planning figures from Shipped’s delivery guidelines. These are supplier-specific; your dispatcher must confirm the truck and site.
Not on a residential lot as a storage structure: §13.10.050(A)(2) says sea cargo containers are prohibited, and residential storage must be inside an enclosed building. Containers can be allowed temporarily on active construction sites, and as permitted outdoor storage in industrial zones. [2] [1] [3]
Usually a planning permit rather than a building permit. Santee exempts temporary storage containers from building permits, but construction-site containers fall under the temporary use rules, industrial outdoor storage needs a minor conditional use permit, and any street placement needs an encroachment permit. [5] [1] [3] [6]
Yes, temporarily, if there is an active building permit. It may hold only building materials or merchandise for the project, and it and any screening must be removed when the building permit or temporary use permit expires or is completed. [1]
Only with an Engineering encroachment permit. Apply on the Permitting & Licensing Portal with a site plan, dimensions and duration; the city's guide asks for four weeks' lead time and quotes 10–15 working days for processing. [6] [7]
No. Shipped and Eveon publish three-month minimums, but Santee's permit dates control how long the container may stay. Get the city approval and its end date first, then negotiate pickup. [11] [12] [1]
Shipped’s published Nov 6, 2026 snapshot for Los Angeles, CA, the nearest market with a published price list, lists a used 20ft wind-and-watertight container at $1,447 and a used 40ft standard at $1,747. These are container-only advertised prices. Request a current quote with the delivery address, tax, condition, and all fees. Check the source price list and compare Eveon using the same specification.
No. Yardbox is a comparison guide. We do not own a depot or hold inventory. Ask the supplier for the actual transport origin, current stock, and whether customer pickup is possible. A city listing does not establish a pickup address.
Compare the supplier’s written condition definitions and remedy, not only the abbreviation. Ask for floor, roof, door-seal, and interior photos or inspection details. If the container will carry freight, confirm the required certification separately. See Shipped’s grade descriptions or read our used-container checklist.
Reviewed Nov 8, 2026. We prioritize official planning, transportation, and code resources. Supplier facts are attributed separately; we have not inspected local inventory.
Browse all city prices or compare supplier terms before requesting a quote.